Hydropower plants increase power generation to back up coming floods
After the prolonged drought and a lack of water, hydropower plants are being increased the power generation via turbines, known as water discharge to back up for the rainy season and flooding.
In the upcoming time, the Northern region is about to enter its main flood season so the volume of the water flow to hydropower plants is expected to rise higher compared to the passing time. Therefore, the hydropower plants in the Northern region need to adjust the water levels to ensure power supply for the region and gradually reduce the water levels inside the reservoirs to receive flooding and prevent it as regulated.
Huyen Huong